Water management constructionFlood-sediment removal from the Elbe
Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Vysoká nad Labem
Services
Watercourse works, weirs and reservoirs, drainage and flood protection.

We do water-management work for river authorities, municipalities and private clients. We modify and revitalise watercourses, repair weirs and dams, desilt reservoirs and lay land drainage. We build so it holds even in high water — and so the landscape is left in good shape.
Water management constructionRemoval of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Write or call. We'll arrange a site visit and tell you straight whether and how it works.