Water management construction

Dolní Dobrouč, river km 1.5–4.9, sediment removal

Dolní Dobrouč · 2026

Field
Water management construction
Location
Dolní Dobrouč
Year completed
2026
Client
Lesy ČR

Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.

From this field

All references
Flood-sediment removal from the ElbeWater management construction

Flood-sediment removal from the Elbe

Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.

Povodí Labe

Vysoká nad Labem2026
Water management construction

Hradečná, km 0.000–2.610, sediment removal

Repair and maintenance of the existing trained channel — restoring its original capacity by dredging sediment across the full reach and securing undermined stone structures. Surplus material was hauled to a licensed landfill.

Lesy ČR

2024
Water management construction

Loučka, Dlouhomilov and Hrabišín, sediment removal

Maintenance works within the built-up areas of Dlouhomilov (river km 5.90–6.35) and Hrabišín (river km 7.40–9.95) — sediment removal and tree felling.

Lesy ČR

Dlouhomilov, Hrabišín2024

Tell us what you need

Call or write. We'll come and look at the site and tell you straight whether and how it can be done. The visit and the quote are free.

CallGet a quote