Water management construction

Lodrantka, Dolní Roveň, sediment removal, river km 5.280–5.420

Dolní Roveň · 2020

Field
Water management construction
Location
Dolní Roveň
Year completed
2020
Client
Povodí Labe

Restoration of the flow parameters of a trained channel — maintenance works comprising removal of 262 m³ of sediment and associated care and thinning of the bank vegetation.

From this field

All references
Flood-sediment removal from the ElbeWater management construction

Flood-sediment removal from the Elbe

Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.

Povodí Labe

Vysoká nad Labem2026
Dolní Dobrouč, river km 1.5–4.9, sediment removalWater management construction

Dolní Dobrouč, river km 1.5–4.9, sediment removal

Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.

Lesy ČR

Dolní Dobrouč2026

Tell us what you need

Call or write. We'll come and look at the site and tell you straight whether and how it can be done. The visit and the quote are free.

CallGet a quote