Water management constructionFlood-sediment removal from the Elbe
Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Povodí Labe
Water management construction
Zaječice · 2019
Removal of sediment from the weir pool on the Ležák in the village of Zaječice.
Water management constructionRemoval of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Povodí Labe
Water management constructionChannel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.
Lesy ČR
Removal of damage from the 2024 flood — dredging of approx. 430 m³ of sediment at Zvole and 680 m³ at Česká Skalice.
Povodí Labe

Call or write. We'll come and look at the site and tell you straight whether and how it can be done. The visit and the quote are free.