Water management construction

Hrabyňka, Háj ve Slezsku, km 0.558–1.365

Háj ve Slezsku · 2023

Field
Water management construction
Location
Háj ve Slezsku
Year completed
2023
Client
Lesy ČR

Water-management maintenance works of a watercourse-training character in the existing Hrabyňka channel within the built-up area of Háj ve Slezsku, close to regional and local roads (Smolkov and Chabičov ve Slezsku cadastral areas).

From this field

All references
Dolní Dobrouč, river km 1.5–4.9, sediment removalWater management construction

Dolní Dobrouč, river km 1.5–4.9, sediment removal

Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.

Lesy ČR

Dolní Dobrouč2026
Flood-sediment removal from the ElbeWater management construction

Flood-sediment removal from the Elbe

Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.

Povodí Labe

Vysoká nad Labem2026
Water management construction

Hradečná, km 0.000–2.610, sediment removal

Repair and maintenance of the existing trained channel — restoring its original capacity by dredging sediment across the full reach and securing undermined stone structures. Surplus material was hauled to a licensed landfill.

Lesy ČR

2024