Water management construction

Dubanka, Dubany, sediment removal, river km 0.000–2.240

Dubany · 2024

Field
Water management construction
Location
Dubany
Year completed
2024
Client
Povodí Labe

Removal of sediment and trees from the flow profile and mowing of grass in the channel of the Dubanka (IDVT 10185478), restoring the channel's original capacity.

From this field

All references
Flood-sediment removal from the ElbeWater management construction

Flood-sediment removal from the Elbe

Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.

Povodí Labe

Vysoká nad Labem2026
Dolní Dobrouč, river km 1.5–4.9, sediment removalWater management construction

Dolní Dobrouč, river km 1.5–4.9, sediment removal

Channel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.

Lesy ČR

Dolní Dobrouč2026