Water management constructionFlood-sediment removal from the Elbe
Removal of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Povodí Labe
Water management construction
Hlinsko · 2020
Maintenance works in the channel of an engineered watercourse (historically trained to pass flood flows without damage) where erosion and sedimentation had formed numerous deposits along both banks and at crossings with transport and utility infrastructure. Exposed deposit surfaces were becoming overgrown with wetland vegetation and trees, further reducing channel capacity and impeding the passage of suspended load and ice.
Water management constructionRemoval of flood damage from the September 2024 flood on the Elbe below the Opatovice weir — dredging approx. 9,138 m³ of sediment, river km 987.670–987.863.
Povodí Labe
Water management constructionChannel maintenance consisting of removing deposited sediment from the flow profile, including bank vegetation care — clearing self-seeded shrubs and unsuitable trees restricting the flow profile.
Lesy ČR
Removal of damage from the 2024 flood — dredging of approx. 430 m³ of sediment at Zvole and 680 m³ at Česká Skalice.
Povodí Labe